{"id":1885,"date":"2012-07-20T11:12:24","date_gmt":"2012-07-20T11:12:24","guid":{"rendered":"http:\/\/zierhut.cmstest.de\/?p=1885"},"modified":"2016-01-22T17:04:40","modified_gmt":"2016-01-22T16:04:40","slug":"campe-high-school-holzminden","status":"publish","type":"post","link":"https:\/\/www.zierhut-architekten.de\/en\/architecture\/competitions\/schools\/campe-high-school-holzminden\/","title":{"rendered":"CAMPE HIGH SCHOOL HOLZMINDEN"},"content":{"rendered":"<p>The design proposal for the Campe &#8211; High School in Holzminden includes a compact three-storey newly constructed building without a basement, which on its north side connects to the existing old building structure (Remtergeb\u00e4ude). Creating an ensemble of old and new.<\/p>\n<p>The new building contains a central atrium on the upper floors, which is located in the symmetry axis of the old building\u2019s median risalit and correlates with its dimensions to the former auditorium: an imprint of the old arises in the new. The new atrium is a glimpse into the future of the traditional Campe \u2013 Gymnasium. <\/p>\n<p>Teaching and classrooms as well as the new assembly hall and a caf\u00e9 are situated within the new building. The old structure is dedicated to the teachers and the administration. Three schoolyards offer a generous supply of open space.<\/p>\n<p>To connect the new design directly with the old building, a simple structure and homogeneous facade is proposed. A conventional load carrying system, a passive air conditioning by building tempering and natural ventilation are the foundations of an optimal thermal utilization. Moreover the choice of material is key for a durable building.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Realization competition with prior application procedure<\/p>\n<ul class=\"features\">\n<li>\n<div>Customer<\/div>\n<div>Landkreis Holzminden<\/div>\n<\/li>\n<li>\n<div>Location<\/div>\n<div>Holzminden<\/div>\n<\/li>\n<li>\n<div>Period<\/div>\n<div>2012<\/div>\n<\/li>\n<\/ul>\n","protected":false},"author":2,"featured_media":2273,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36],"tags":[],"_links":{"self":[{"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/posts\/1885"}],"collection":[{"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/comments?post=1885"}],"version-history":[{"count":2,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/posts\/1885\/revisions"}],"predecessor-version":[{"id":2641,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/posts\/1885\/revisions\/2641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/media\/2273"}],"wp:attachment":[{"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/media?parent=1885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/categories?post=1885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zierhut-architekten.de\/en\/wp-json\/wp\/v2\/tags?post=1885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}